Drying the Job

After removing the excess fixture material, dry off the job by wiping off the excess moisture that remains on it. The "impregnation" process, where the job is soaked in a specialized liquid, makes it easy for liquid to soak into the job, increasing the strength of the job after firing.

Place the job in an environment with a temperature of 20°C to 24°C (68°F to 75.2°F) and a humidity of 50%RH or less for 12 hours or more.