When installing the machine |
Spindle Run-in (Warm-up)
Correcting the Milling Position
|
When replacing the spindle unit |
When the machine has not been used for a prolonged period |
Spindle Run-in (Warm-up) |
Before milling on days when the ambient temperature is low |
When moving the machine to a different installation site |
Correcting the Milling Position |
When the milling position is misaligned |
When symptoms such as a hole in the Z direction occur |
Once a month |
Retightening the Collet |
When the working time of the spindle exceeds 200 hours |
When water or dust accumulates on the regulator |
Cleaning the Bowl |