When Maintenance Is Required
| When installing the machine | Perform Spindle Run-inCorrecting the Milling Position |
| When replacing the spindle unit |
| When the machine has not been used for a prolonged period | Perform Spindle Run-in |
| When moving the machine to a different installation site | Correcting the Milling Position |
| When the milling position is misaligned | |
| When symptoms such as a hole in the Z direction occur | |
| When a milling bur replacement error occurred |
| When the work time exceeds 20 hours | Replacing the CoolantCleaning the Coolant Nozzle |
| When 14 days have passed since the last coolant replacement |
| When water or dust accumulates on the regulator | Regulator Maintenance |
| When milling waste or dirt has accumulated inside the machine | Preventing Adhering of Milling Waste (Flushing) |